1、水泥出料前,搅拌筒应以10~12rpm的转速旋转1分钟后出料。
1. Before cement discharging, the mixing drum should rotate at 10-12rpm for 1 minute before discharging.
2、卸料后,应立即用车上的软管冲洗入口、卸料漏斗和卸料槽,将附着在车体上的污垢和残余混凝土排出,然后向搅拌筒内注水。回程时,搅拌筒应缓慢转动,清理内壁,以免残留的炉渣附着在筒壁上,搅拌叶片在一次装料前将水排干。
2. After discharging, the hose on the truck shall be used to flush the inlet, discharge funnel and discharge tank immediately to discharge the dirt and residual concrete attached to the truck body, and then inject water into the mixing drum. When returning, the mixing drum should rotate slowly to clean the inner wall, so as to avoid the residual slag adhering to the drum wall, and the mixing blade will drain the water before the primary charging.
3、运输水泥时,发动机转速在1000-1400转/分范围内,使发动机产生扭矩,转速不超过40/小时
全自动自上料搅拌车
3. When the cement mixer transports cement, the engine speed is in the range of 1000-1400 rpm, so that the engine produces torque, and the speed is not more than 40 km / h
4、水泥搅拌运输车完工后,应对搅拌筒内部和筒体进行清理,不得将剩余混凝土留在搅拌筒内。
4. After the completion of the cement mixer truck, the inside and cylinder of the mixing drum shall be cleaned, and the remaining concrete shall not be left in the mixing drum.
5、水泵工作时,严禁空转,连续使用时间不得超过15分钟。
5. When the water pump of cement mixing truck is working, it is strictly forbidden to idle, and the continuous use time shall not exceed 15 minutes.
6、水箱的水量应始终处于满水状态,以备紧急使用。冬季停机后,应将水箱、水泵、水管、搅拌桶内的水排干,并将水贮存在朝阳无水的地方,以免冻伤机器。
6. The water volume of the water tank of the cement mixer truck should always be full for emergency use. After shutdown in winter, the water in the water tank, water pump, water pipe and mixing bucket shall be drained, and the water shall be stored in the place without water in Chaoyang to avoid frostbite.
7、冬季搅拌车应及时安装保温套管,并用防冻剂保护搅拌机。燃油标签应根据天气变化进行更换,以保证机器的正常使用。
7. In winter, the mixer should be installed with insulating sleeve in time, and the mixer should be protected with antifreeze. The fuel label should be replaced according to the weather change to ensure the normal use of the machine.
8、泥搅拌运输车液力传动部分检修时,发动机、液压泵应无压运转。
8. When the hydraulic transmission part of cement mixer truck is overhauled, the engine and hydraulic pump should run without pressure.